Hold an 11 MW schedule to the package, not the spreadsheet

Work packages, subcontractor scopes, material reconciliation and progress claims on one record — so the client, the lender and the site all see the same percentage complete.

11 MW
Largest single project run end to end
96%
Progress claims accepted without dispute
3.8%
Material variance against issued quantity
0
Reconciliations done in a spreadsheet
The problem

Everyone has a different percentage complete

On a utility site the schedule lives in one tool, the material issue register in another, and the subcontractor’s claim in a third. The three never agree, and the argument happens at month end.

4 sources of truth on progress

Planning, site, procurement and the client each measuring something slightly different.

9% material variance

Issued quantity against installed quantity, discovered late, absorbed as cost.

18 days to settle a progress claim

Because the evidence behind the claim has to be assembled after the fact.

Installed quantity is an estimate

A supervisor’s figure at the end of the day, with the photos to prove it taken later, if at all.

Subcontractor payouts negotiated, not measured

Without verified quantity per package, every invoice becomes a conversation.

Risk surfaces at the monthly review

A block that fell behind in week two is discovered when the client’s report is due.

How it works

Packages, evidence, reconciliation, claim

Step 01 · Package

Break the scope into work packages

Blocks, rows, trackers and civil scopes become packages with quantities, rates and a responsible subcontractor.

Powered byReDesk AI ›
Work package breakdown for a utility site
Step 02 · Issue

Material issued against the package

Every module, tracker and cable drum is issued to a package and scanned on receipt, so variance is visible daily instead of quarterly.

Powered byReCart Buyer ›
Material issue and goods receipt
Step 03 · Verify

Progress measured on site, with proof

Crews and QA record installed quantity against the package with geotagged evidence, so percentage complete is measured, not estimated.

Powered byRePartner ›
Site verification against a work package
Step 04 · Claim

The claim assembles itself

A progress claim is generated from verified quantities with the evidence attached — which is why it stops being negotiated.

Powered byRePrime ›
Progress claim with attached evidence
What is doing the work

Four products, one work-breakdown structure

The package is the unit of everything: scope, material, progress, payment. That single choice removes most month-end reconciliation.

Outcome

Arka Renewables holds an 11 MW schedule to the package, not the spreadsheet

Their planning team stopped rebuilding the programme every Friday, because the site was already reporting against it.

11 MW
Project delivered on the platform
3.8%
Material variance, down from nine
4 days
To settle a progress claim
1
Agreed percentage complete

Other solutions built the same way

See all solutions ›

Bring one work package and its claim history

We will rebuild it on the platform and show you where the nine percent went.