Run the same install forty times, not forty different installs

One template covers the survey, the design rules, the crew checklist and the payment gates. Every site after the first one gets faster, and the quality stops depending on who showed up.

18 days
Median site cycle, survey to commissioning
92%
Sites commissioned inside the promised window
31%
Less rework on multi-site programmes
1
Template behind every site in the portfolio
The problem

Site nineteen does not benefit from site one

Commercial rooftop work is repetitive in shape and different in detail. Without a template, every site relearns the same lessons, and the client sees a different standard each time.

6 weeks typical site cycle

Not because the work takes six weeks, but because handoffs between survey, design and crew sit idle.

3 versions of the same checklist

One in a printout, one on a supervisor’s phone, one in a spreadsheet nobody updates.

22% of sites need a second crew visit

Usually for a part that was never ordered, or a photo nobody took the first time.

Progress lives in a WhatsApp group

Which means it lives with whoever scrolled far enough that morning.

Parts ordered by phone, received by memory

Nobody can say which serial went to which roof until the warranty claim asks.

Every site starts from zero

The lesson from site one is in someone’s head, not in the SOP site nineteen follows.

How it works

Template once, repeat everywhere

Step 01 · Template

Write the install down once

Design rules, component defaults, crew skills, evidence requirements and payment gates captured as a reusable programme template.

Powered byReDesk AI ›
Programme template configuration
Step 02 · Clone

Spin up each site from the template

A new site inherits everything and only asks for what is genuinely site-specific — roof geometry, load profile, sanction load.

Powered byReStudio ›
Rooftop array layout across multiple buildings
Step 03 · Execute

Crews run the same SOP on every roof

Nineteen steps, photo evidence at each gate, working offline. A failed gate opens a snag with an owner instead of a message in a group.

Powered byRePartner ›
Field crew working the install SOP
Step 04 · Roll up

One view across the whole programme

Progress, cost drift, open snags and generation per site, so a client with eighteen roofs gets one honest answer.

Powered byRePrime ›
Portfolio roll-up across sites
What is doing the work

Four products, one programme

The template is not a document — it is the configuration the platform actually executes. Change it once and every future site inherits the change.

Outcome

Trishul Infra rolled one install template across eighteen sites

The first site took five weeks. The eighteenth took eleven days, with the same crew size and a lower snag count.

11 days
Cycle time by site eighteen
1
Template maintained, not eighteen
34%
Fewer snags per site
12.6 MW
Delivered in the programme

Other solutions built the same way

See all solutions ›

Bring your worst multi-site programme

We will template one of your sites live and show you what site two would look like.