Serials are captured on a delivery note, installed by whoever was on site, and reconciled never. When a batch develops a fault or a lender asks for ALMM evidence, the answer is an educated guess.
Which tells you what arrived at the warehouse, not what ended up on the roof.
Every site in the window gets a visit, because nobody knows which ones actually have the batch.
Certification, invoices and installed evidence assembled by hand, per site.
A twenty-character code copied from a label at dusk, into a column nobody checks.
BIS and ALMM paperwork filed at purchase and never linked to the panel it covers.
The claim needs the serial, the invoice and the install photo together; each is with someone else.
Every catalogue component carries its datasheet, BIS and ALMM status, and warranty terms — versioned, so an old project still opens.
Powered byReCart Buyer ›Goods receipt binds each serial to the project and the batch, so stock is traceable from the moment it lands.
Powered byReCart Buyer ›Crews scan each serial as it goes up, against the string and position in the approved design. The as-built is captured, not reconstructed.
Powered byRePartner ›Query by batch, supplier, site or date and get the exact list — with certification, invoice and install photograph attached.
Powered byReSure ›Traceability is a by-product of how procurement and installation already work here. Nobody keeps a separate register.