ReDesk
NewProposals drafted by ReDesk AI in under four minutesSee what's new
Case studySunfield EPC cut feasibility turnaround from 3.4 days to 6 hoursRead the story
Pricing
Sign inSchedule a demo
ReDesk AI · Operations HQ

Intelligent design automation for faster proposals

Size the system, place the panels, price the bill of materials and send a branded proposal — in the time it used to take to open the spreadsheet.

Web appiOSAndroid
Free 14-day trial · No card required
ReDesk AI interface
3.8 minmedian proposal time
50+ native integrations
Browse the catalogue ›
SalesforceHubSpotZohoQuickBooksTallyRazorpayBBPSSolarEdgeGrowattGST e-invoice
All products ›
Why teams switch

The quote is the fastest part of the job again

Sizing that survives the site visit

Shade, orientation and load profile drive the layout — so the design you sold is the design the crew installs.

Bill of materials priced live

Every line item pulls the current ReCart price and lead time, so margin is visible before the customer sees the number.

One click from win to project

An accepted proposal becomes a scheduled project with its SOP, crew and milestone payments already attached.

Product tour

Four screens, one continuous record

Read the docs ›
Roof polygon and array layoutProposal builder with pricingExecution board with approvalsAnalytics with revenue against target
Part of the stack

ReDesk AI writes to the same record as everything else

A proposal drafted here becomes procurement in ReCart, a schedule in RePartner, milestone payments in finance and a live dashboard in RePrime — without a single export.

ReCart BuyerReStudioRePartnerRePrime
redesk.ai / projects / nagpur-rooftop-4.2mwLive
ReDesk execution board writing to the shared project record
Capabilities

Everything the estimating desk asked for

Shade and yield modelling

Hourly irradiance against the roof geometry, with a generation estimate the finance team will accept.

Subsidy and net-meter packets

The forms assemble themselves from documents already on the project record.

Version history on every quote

See what changed between revision three and revision seven, and who approved it.

Role-based pricing controls

Floor margins, discount ceilings and approval thresholds that hold without a phone call.

Offline site capture

Surveyors record readings and photos without signal; everything syncs when they are back.

Audit trail by default

Every state change carries a name, a timestamp and the evidence it was based on.

72%
Less time from enquiry to signed proposal
3.8 min
Median time to a priced, branded document
₹24,780
Released against verified work each week
19
SOP steps tracked on every install
Nagpur · 4.2 MW rooftop portfolio
“We stopped rebuilding the same quote in three tools. The estimator finishes a proposal before the site engineer has left the roof.”
Meera IyerHead of Projects, Sunfield EPC
Pune · 11 MW C&I portfolio
“The lender stopped asking for a call. Every assumption behind the yield is a link now, so the file answers the question before it is asked.”
Rohit DesaiDirector, Arka Renewables
Kochi · 2.8 MW rooftop
“Margin used to be a month-end surprise. I can see which project is drifting on the day it starts drifting.”
Kavya MenonHead of Finance, Helios Power
Questions

Questions teams ask first

Yes. Salesforce, HubSpot and Zoho sync both ways — leads stay where your sales team lives, and the project record picks up from the moment a deal is won.

Layouts are generated from the roof polygon, obstruction map and your own installation rules — setbacks, walkways, string limits. Engineers can override any panel, and the override is what gets priced.

Access is role-based and scoped to the project. Subcontractors see only their steps; finance sees the ledger; the customer sees the tracker. Every view is logged.

Most teams run their first live project inside two weeks: one week to load the catalogue and templates, one week shadowing a real install.